An error has occurred. An error has occurred.
An error has occurred. An error has occurred.

C-07 Genoa Red Bluff Stormwater Detention Basin

C-07 Genoa Red Bluff Stormwater Detention Basin
An error has occurred. Error: DDR Menu is currently unavailable.

Recent Actions

August 23, 2022 – Harris County Commissioners Court approved a change in contract adding 217 calendar days and $410,168 to the contract amount in support of this project.

August 2, 2022 – Harris County Commissioners Court authorized a change in contract for the excavation of the Genoa Red Bluff Stormwater Detention Basin – Phase 1, adding 32 calendar days with no change to the contract amount.

April 5, 2022 – Harris County Commissioners Court authorized a change in contract for the construction of the Genoa Red Bluff Stormwater Detention Basin – Phase 1, adding 32 calendar days with no change to the contract amount.

June 29, 2021 – Harris County Commissioners Court authorized $2,111,794 for for phase 1 excavation of this project.

June 8, 2021 – Harris County Commissioners Court authorized an agreement in the amount of $379,354 with an engineering firm for services in support of this project.

April 27, 2021 – Harris County Commissioners Court has authorized advertisement for bids for Phase 1 construction of this project.

July 14, 2020 – Harris County Commissioners Court authorized negotiations with an engineering firm for preliminary engineering, design, bidding and construction stage engineering services for development of the B509-04-00 compartment.

May 19, 2020 - Harris County Commissioners Court approved updates to project details in the 2018 Bond Program List. Update changes project title to include B509-03-00 and to remove the incorrect basin name. B509-03-00 right-of-way is immediately adjacent to B509-04-00.

April 28, 2020 - Harris County Commissioners Court authorized and initiated this project.

Project description

The Genoa Red Bluff Stormwater Detention Basin project includes two adjacent compartments in east Harris County that border on Armand Bayou Tributary B109-00-00. The two compartments will be developed separately, but ultimately will work together to reduce the risk of flooding in the Armand Bayou watershed.

Stormwater detention basins reduce flooding risks by temporarily taking in and holding excess stormwater during heavy rain events, and releasing the stormwater back to the adjacent channel when the threat of flooding has passed.


Location

  • HCFCD Unit B509-03-00, the northern of the two compartments, is approximately 205 acres and located south of West Fairmont Parkway at Genoa Red Bluff Road.
  • HCFCD Unit B509-04-00, the southern of the two compartments, is approximately 62 acres and located north of Red Bluff Road.

Stage

As of March 2023, the preliminary engineering stage of the project lifecycle was completed for Genoa Red Bluff Stormwater Detention Basin project. The Preliminary Engineering Report document recommends one alternative for the ultimate configuration of the entire Genoa Red Bluff Stormwater Detention Basin project site. Design initiation is anticipated in summer 2023.

Milestones

Preliminary grading and excavation of a portion of the northern compartment (HCFCD Unit B509-03-00) began in Summer 2021 and was substantially completed in October 2022.

Bond Listing

Funding for Design and Construction comes from Bond ID C-07 in the 2018 Bond Program.

B509-04-00 C-07 Genoa Red Bluff Stormwater Detention Basin

Virtual Community Engagement Meeting

The Harris County Flood Control District held a Community Engagement Meeting for the Genoa Red Bluff Stormwater Detention Basin project in the Armand Bayou watershed.

Date: Thursday, March 24, 2022
Time: 6:30 – 7:30 p.m.

meeting summary Presentation Meeting Video

Virtual Community Engagement Meeting

The Harris County Flood Control District held a virtual Community Engagement Meeting for the Genoa Red Bluff Stormwater Detention Basin project in the Armand Bayou Watershed.

Date: Thursday, November 11, 2021
Time: 6:30 – 7:30 p.m.

meeting summary Presentation Meeting Video