An error has occurred. An error has occurred.
An error has occurred. An error has occurred.

P190-00-00 Sediment Removal and Pipe Replacement

P190-00-00 Sediment Removal and Pipe Replacement
An error has occurred. Error: DDR Menu is currently unavailable.

PROJECT DESCRIPTION

In Fall 2019, the Flood Control District began a maintenance project that will remove sediment from an earthen drainage channel formally identified as P190-00-00 and a subsequent project will replace damaged outfall pipes. The purpose of the projects, P190-00-00-X002 and P190-00-00-X003, is to restore positive flow to the channel and help to move stormwater out of the surrounding area. 

These maintenance projects will occur along the upstream end of P190-00-00, a tributary to Greens Bayou, south of Lauder Road and just north of Aldine Mail Route Rd.