An error has occurred. An error has occurred.
An error has occurred. An error has occurred.

F-14 Kingwood Diversion Ditch

F-14 Kingwood Diversion Ditch
An error has occurred. Error: Side Menu is currently unavailable.

Recent Actions

December 14, 2021 -Harris County Commissioners Court approved a temporary right-of-entry agreement with the City of Houston to provide access to HCFCD Unit G103-38-00 for the purpose of geotechnical soil borings.

June 29, 2021 - Harris County Commissioners Court authorized $1,148,863 for preliminary engineering services in support of this project.

February 9, 2021 - Harris County Commissioners authorized the negotiation of an agreement for engineering services in support of this project.

Project Description

The proposed improvements to the Kingwood Diversion Ditch include channel modifications, flow diversion from Bens Branch, bridge replacements, as well as the purchase of additional land to construct a new outfall to the West Fork San Jacinto River.

The anticipated reduction in water surface elevations along the Kingwood Diversion Ditch and Bens Branch from the proposed improvements would result in the removal of the 100-year stream inundation area from 62 structures and would allow for local drainage improvements that could benefit an additional 586 historically flooded structures.