An error has occurred. An error has occurred.
An error has occurred. An error has occurred.

Z-02 Partnership Project with HCMUD 249

Z-02 Partnership Project with HCMUD 249
An error has occurred. Error: DDR Menu is currently unavailable.

Recent Actions

August 24, 2021 – Harris County Commissioners Court authorized an interlocal agreement in the amount of $775,557 with the Harris County Municipal Utility District No. 249 in support of this partnership project.

Project Description

Construction will begin in early 2022 on a partnership project within the limits of Harris County Municipal Utility District No. 249 to build stormwater detention that will:

• Mitigate for future drainage improvements in existing subdivisions and
• Provide flood risk reduction in the Cypress Creek watershed

The project involves construction by HCMUD 249 of a stormwater detention basin on a 6.810-acre site near the confluence of Lemm Gully K120-00-00 and its tributary Wunsche Gully K120-03-00, north of Cypresswood Drive between Interstate Highway 45 and the Hardy Toll Road. The basin is designed to take in and temporarily hold approximately 37 acre-feet, or more than 12 million gallons, of stormwater during heavy rain events.

The Flood Control District contributed $775,557 in 2018 Bond funding toward the project, under Bond ID Z-02 for partnership projects. HCMUD 249 spent $610,122 on purchasing right-of-way from the Flood Control District and contributed $165,435.00 toward design and construction, plus additional right-of-way.

HCMUD 249 is managing the project.