An error has occurred. An error has occurred.
An error has occurred. An error has occurred.

F-119 Drainage Improvements Tributary J131-01-00

F-119 Drainage Improvements Tributary J131-01-00
An error has occurred. Error: DDR Menu is currently unavailable.

Recent Actions

August 10, 2021 – Harris County Commissioners Court authorized negotiations with an engineering firm for preliminary engineering and final design services is support of this project

July 20, 2021 – Harris County Commissioners Court authorized the Flood Control District to proceed with preliminary engineering, design, and construction of drainage improvements along J131-01-00 in support of this project.

PROJECT DESCRIPTION

This project involves installation of a storm sewer system to capture stormwater runoff from near the intersection of Zion and East Hufsmith roads in north Harris County. The flows will be routed through the new storm sewer system along Zion Road to then discharge into proposed channel conveyance improvements to Spring Creek tributary J131-01-00 downstream of Zion Road. The project includes required stormwater detention storage to mitigate for the increased stormwater flows.

Virtual Community Engagement Meeting

The Harris County Flood Control District held a Community Engagement Meeting for the Tributary J131-01-00 Stormwater Conveyance Improvement project in the Spring Creek watershed.

Date: Wednesday, April 20, 2022
Time:
6:30 – 7:30 p.m.

meeting summary Presentation Video Presentation